|
Our Projects
Dredging Project
One endeavor is to have Lake Pelican dredged so that approximately 6 springs can be opened to add natural water into
the lake and improve fish habitat for the sportsman.
Flood Protection Project
There will be flood protection on the near horizon for our entire area. This could be achieved more economically and
quicker than other previous designs or ideas. The Lake Pelican Water Project district has contracted the professional
services of the Bar Engineering Company of Minneapolis, MN for a Comprehensive Water Resources Management Plan and the
design of multiple small dams and water detention structures in the tributaries draining into the Sioux River.
|
This
concept is as old as Mother Nature herself; constructed and implemented by Barr Engineering over 200 times prior in
varying design sizes (this does not include other engineering firms using the same similar concept). This was approved
by 81% of the land owners polled locally. Nationally, this is found to be the most environmentally friendly
approach.
Wetland Restoration Project
Restoration of a 55-acre wetland bordering Lake Pelican is on the drawing board. A public outdoors educational
center is currently planned when the project is completed. Also, there are three sites in the upper watershed that are in the
planning stages for construction and restoration into wildlife wetlands and habitat.
|